If you are building a new home in Frodsham or elsewhere in WA6, the roofing stage sits between the structure going up and the inside being fitted out. Our new roofing installations in Frodsham page sets out the service; this guide explains how the stage works.
What the Roofing Stage Covers
- Fixing the underlay and the battens over the roof structure.
- Laying the slates or tiles to the specified covering.
- Fitting the ridge, hips, verges and eaves details.
- Forming valleys, abutments and the flashings round chimneys and any roof windows.
- Leadwork where the design calls for it.
What We Need Before We Start
- Drawings and the specification. The roof covering is often named in the planning approval or the building specification.
- A finished roof structure. The rafters or trusses, bracing and any structural openings need to be in place and signed off by whoever is responsible for them.
- Access. Scaffolding with safe edge protection, and room to store materials.
- A clear programme. The date the structure will be ready, and when other trades need the building watertight.
Which Covering?
The planning approval may set the covering, such as natural slate or a particular tile, so check before ordering. Where there is a choice, our guide on slate versus tile roofing sets out the differences, and modern concrete tiles covers a common option.
How the Work Runs
- Check the structure, set out the roof and confirm the covering and details.
- Fit the underlay and battens, set to the gauge for the chosen covering.
- Lay the covering from the eaves up, cutting in at valleys, hips and abutments.
- Fit the ridge and verges, then the flashings round chimneys and openings.
- Check the roof, clear up and hand over so the other trades can follow.
Getting the Details Right
The details decide whether a new roof stays dry. Eaves, verges, valleys and the junction with walls and chimneys take more care than the plain areas of tiles. Ventilation and insulation also need to be planned with the design, not added afterwards. See insulation and ventilation upgrades.
Timing and Weather
A new build is exposed until the roof is on, so the roofing stage is usually scheduled as soon as the structure allows. Weather can delay it, and we agree timings with you rather than promise dates we cannot control. For general timing, see how long a new roof installation takes.
Getting a Quote
Send us the drawings and the specification if you have them. Ring 07916 318 808 or use the form on our new roofing installations in Frodsham page.
Frequently Asked Questions
What do you need to quote for a new build roof?
The drawings and specification are the best starting point, including the roof covering, the roof plan and any details such as valleys, chimneys and roof windows.
Can you fit the covering my planning permission names?
Tell us what the approval says and we will confirm. If the covering is not specified, we can talk through the options.
Who is responsible for the roof structure?
The roof structure is normally the responsibility of the main builder or designer. We fit the covering and the weatherproofing details once it is in place.
How long does the roofing stage take?
It depends on the size and shape of the roof. A simple roof is quicker than one with many hips, valleys and abutments. We explain the programme in the quote.